Find a plumber for bathroom and kitchen

Plumbing companies are responsible for everything that carries water: supply pipes, waste pipes, fixtures in the bathroom and kitchen, washing machine connections and the connection to the heating system. In renovations, they are needed twice over: for the first-fix installation in the opened-up wall and for fitting the fixtures at the end. Between those two appointments come the tilers and often the plasterers.

What a plumbing company does

It lays cold and hot water pipes as well as waste pipes, installs toilets, washbasins, showers, bathtubs and kitchen connections, fits taps and waste fittings, and connects hot water cylinders and heat pumps to the hot-water system. This is in addition to repairs, drain unblocking and fixing burst pipes.

The pipework matters, not the fittings

In a bathroom renovation, choosing the fittings is easy and choosing the pipework is hard, although it should be the other way round. Old galvanised steel pipes narrow over decades because of deposits and rust from the inside. If you only replace the fixtures, you end up with a new bathroom on old pipework. Have the condition of the pipework assessed before deciding on finishes.

What the plumbing side of a bathroom renovation costs

For the plumbing installation in a bathroom renovation, our renovation costs guide gives around CHF 5'000 to 15'000 depending on specification, plus about CHF 3'000 to 20'000 for the fixtures themselves. Tiles, demolition and electrical work are additional. A fully renovated standard bathroom costs considerably more overall than the amount you might expect when looking only at the fixtures.

Order of work in the bathroom

After strip-out comes the first-fix plumbing, then waterproofing and tiling, then the installation of the fixtures. Electrical work and, where necessary, plastering fit in between. Because each trade only needs a few days, the long project durations in the bathroom are not caused by the work itself but by the waiting times in between. A coordinated schedule shortens a bathroom renovation considerably.

Emergency or planned work

In the event of a burst pipe, speed matters: close the main stopcock, call the emergency plumber, document the damage and inform the building insurer. In a planned renovation, the opposite matters, namely time for quotations and planning. Do not confuse the two situations: a renovation commissioned under time pressure is rarely inexpensive and rarely good.

Prevent water damage

The most common water damage arises at washing machine and dishwasher connections, at old angle valves and at silicone joints in the shower. A water-stop device at the appliance connection, replacing valves during every renovation and checking the joints regularly cost little and prevent damage that can quickly run into five figures and affect neighbouring flats.