Photovoltaics: find a solar company for your roof

A solar installation pays off through the electricity you consume yourself, not through what you feed into the grid. Solar contractors plan and install modules, inverters and storage, register the installation with the grid operator and integrate it into the building's electrical installation. The most important decision is made before installation: coordinating it with the roof.

What a solar contractor does

They assess roof area, orientation and shading, size the modules and inverters, plan self-consumption, install the system, register it with the grid operator and handle commissioning and monitoring. If needed, battery storage and integration with a heat pump and charging point are added.

Self-consumption beats system size

The feed-in tariff is significantly lower than the price you pay for electricity drawn from the grid. The key economic factor is therefore how much of the electricity generated you use yourself. A heat pump, hot-water cylinder and charging point are the most effective loads because they can be time-controlled. A smaller system with high self-consumption beats a large one that mostly feeds into the grid.

First the roof, then the system

A photovoltaic system lasts for decades. If roof refurbishment is due during that time, the system has to be dismantled and reinstalled, which eats up a substantial part of its return. Have the condition of the roof covering assessed before planning. If the roof is nearing the end of its service life, refurbishment and the system should be done as part of the same job.

Permits and townscape

Sufficiently adapted roof-mounted systems are subject to notification rather than a permit requirement in many building zones, whereas stricter rules apply in core zones, townscape zones and protected zones, as well as for protected buildings. The rules vary by canton and municipality. Clarify your case with your municipality before ordering, not after the modules have been delivered.

What to look for in the quote

Ask for a yield forecast with the underlying assumptions on orientation, pitch and shading, not just a power rating in kilowatt-peak. Have modules, inverters, mounting structure, electrical works, registration and commissioning listed separately, and clarify the warranty periods for modules, inverters and installation, which differ significantly.

Who else is involved

Installation also involves roofers and sheet-metal workers, because penetrations through the roof covering must remain watertight, and the electrical installer for connection and metering. If roof refurbishment is carried out at the same time, scaffolding is added, as it is needed anyway for the roofer and sheet-metal worker. Clarify in writing who is responsible for the watertightness of the penetrations, because that is exactly where the typical gap in responsibility lies.